About us > Achievements

Canada_A50

DJL constructs 5 km of the new autoroute A50 in the Ottawa region

Construction work done by DJL on the new autoroute A50 that will link Gatineau to Montréal in 2012 began in December of 2008. This 5 km section stretches from Montée St François to Route 321. In the works: deforestation, rock excavation and blasting, swamp draining, bridging of a river and a local road.
x
Previous Next