Public transport in Nîmes
In August 2010, Greater Nîmes
launched works on Line 1
of the TCSP (own-site public
transport system), a northsouth,
6 km-long line passing
through the town centre. In a
joint venture with Maïa Sonnier
and Sols Méditerranée,
Entreprise De Filippis (Eurovia)
secured two works packages
involving laying 15,800 sq.
metres of cobblestones and
28,500 sq. metres of slabs in
Croatian limestone, as well
as 1.5 km of tactile paving in
basalt. The company will also
supply the 25 km of kerbstones
in Croatian limestone for the
infrastructure works package.
The works will take 18 months.